Installation Instructions

2018_10_PSM_MEN
Site and Material Preparation
1) Remove carpet and padding. Also remove any wood ooring installed on concrete. Do not remove products unless
they are asbestos-free.
2) Undercut door frame and wallbase. Slide the ooring at least
1
/4" underneath the door frame and wallbase. Also leave
a concealed
3
/8" minimum expansion space under each.
3) Remove bumps or peaks in suboor and ll depressions with oor leveling compound to ensure no more than
3
/16"
unevenness per 10-foot span.
4) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than a
difference of 25° F and 20% relative humidity between the stocking/transportation environment of the ooring
and the nal installation environment of the ooring.
5) Clean debris from suboor before installation.
6) For concrete suboors, rst install vapor barrier with overlapped seams of 8" or more.
7) For planks without attached underlayment, install over a single layer of underlayment appropriate for laminate
oors.
Site and Material Preparation
A
Door
Frame
Cutting Line
Wallbase
Casing
1 inch
(2,5 cm)
B
%
48 hours
60° – 85° F
15° – 29° C
35% – 65% RH
C
H
suboor
6 mil (0.15 mm) virgin
polyethelene vapor barrier
> 8" (200 mm)
D
E
G
F
2