How to Guide

6. Roll or fold back the dry portion of the second breadth toward the seam, spread the NuBroadlok, and
place the carpet to 3 feet from where the next seam will fall.
7. Be sure to roll out looseness and air bubbles as the carpet is put in place. Repeat above procedures
on continuing breadths. To trim the carpet at the wall, use a razor-blade knife or suitable wall trimmer.
8. Roll completed installation with a 75 lb to 100 lb. roller in both length and width. This will allow the
adhesive to penetrate the carpet back properly.
Please note: Mohawk Industries’ branded adhesives are required to ensure optimum results and are the
only approved adhesives that Mohawk Industries will warrant. Failure to use Mohawk Industries’ branded adhesives
can result in warranties being null and void.
This information, offered as a customer service, is based on Mohawk Industries’ engineering tests and field experience. It is intended
for installers with professional experience, to be used at their discretion and risk. Mohawk Industries does not guarantee results and
assumes no liability in connection with these installation instructions.
DIRECT GLUE-DOWN INSTALLATION
4
FIELD SERVICES 1-888-387-9881