Instructions / Assembly
©2021 mohawkgroup.com | 800.833.6954 1286_Aug/2021 Page 5/8
INSTALLATION
Required Equipment
The following items may be purchased from a local carpet workroom supplier:
Razor Blades Straight Edge
Mohawk Group EnPress Adhesive Framing Square
Floor Scraper Tape Measure
Razor Knives Chalk Line
Scissors Cement-based Patching Compound
75 lb. Roller or 100 lb. Roller Heave Duty Frame Paint Roller with 3/8” Nap Roller OR
a 1/16” x 1/32” x 1/32” U-Notch Trowel
Product Inspection
Make sure to inspect Mohawk Group carpet tiles for dye lot, style, quality and shipping damage prior to installation. Do not
install any product that has visible problems. No claims will be allowed for visible defects after the carpet has been cut and
installed. For concerns, please contact Technical Services at 800.833.6954.
Site Layout
1. The starting point in a carpet tile installation must be as near to the center of the room
as possible and must be positioned to utilize the largest perimeter cut module size.
2. Snap a chalk line parallel to one major wall bisecting, the starting point. It will be
necessary to offset the center chalk line to assure perimeter modules will be at least half size.
3. A second chalk line must be snapped from the starting point at 90° to the rst line. This
can be accomplished using a 6-8-10 or larger triangle, depending on the room size.
(See below). Meters or feet will be used to lay out the triangle in these proportions.
A framing square can also be used.
Pallet and Box Sequencing
It is very important to install carpet tiles in the order they were manufactured. This is easily accomplished by selecting pallets in
sequential order.
Adhesive Application
EnPress Adhesive Application
• EcoFlex NXT, Matrix and AIR require EnPress Adhesive.
• EcoFlex Air requires Enpress adhesive using a 1/16” x 1/32” x 1/32” U-Notch Trowel.
• The use of Mohawk Group branded adhesives is required to ensure optimum results and are the only approved
© 2018 Mohawk Group | mohawkgroup.com
Page 5 / 9
Carpet Tile & Plank Direct Glue Down | INSTALLATION
Site Layout
1. The starting point in a carpet tile installation must be as near to the center of the room as
possible and must be positioned to utilize the largest perimeter cut module size.
2. Snap a chalk line parallel to one major wall bisecting, the starting point. It will be necessary to
offset the center chalk line to assure perimeter modules will be at least half size.
$VHFRQGFKDONOLQHPXVWEHVQDSSHGIURPWKHVWDUWLQJSRLQWDWqWRWKHôUVWOLQH7KLVFDQ
be accomplished using a
6-8-10 or larger triangle, depending on the room size. (See below). Meters or feet will be used
to lay out the triangle in these proportions. A framing square can also be used.
Pallet and Box Sequencing
It is very important to install carpet tiles in the order they were manufactured. This is easily accomplished by selecting
pallets in sequential order.
Adhesive Application
EnPress Adhesive Application
• EcoFlex ICT, NXT, Matrix and AIR require EnPress Adhesive.
• Other adhesives may not be compatible and will void product warranties.
• For EcoFlex ICT, EcoFlex NXT and EcoFlex Matrix carpet tiles, apply the adhesive with a heavy-duty frame paint roller with
a 3/8” nap. A trowel can also be used (1/16” x 1/32” x 1/32” U-Notch minimum). For EcoFlex AIR tiles, the adhesive must
be applied with a 1/16” x 1/32” x 1/32” U-Notch trowel.
• The adhesive must be applied in a FULL SPREAD – NOT grid.
• (QVXUHWKHSURSHUDPRXQWRIDGKHVLYHLVDSSOLHGWRWKHVXEõRRU3ULRUWRLQVWDOODWLRQPDUNRIIDVPDOODUHDRIWKHVXE
õRRUDQGGHWHUPLQHWKHDGKHVLYHVSUHDGUDWH7KLVZLOODOORZ\RXWRGHWHUPLQHWKHSURSHUFRYHUDJHOHYHODQGDPRXQWRI
pressure to apply to the roller during installation.
• On smooth surfaces, be careful not to apply too little adhesive. Just because a surface is smooth and / or sealed, it still
requires a proper coating of adhesive.
• Allow the adhesive to dry to a clear and tacky state. Tiles must be installed immediately after adhesive has dried. To
GHWHUPLQHLIWKHDGKHVLYHLVGU\SUHVVôQJHULQWRDGKHVLYH:KHQGU\DGKHVLYHZLOOQRWWUDQVIHUWRôQJHU
Set-up time is approximately 45 to 90 minutes depending on the climate and humidity.
6’
8’
10’