Installation & Assembly
1|Page
07/27/12
PremiumLuxuryVinylInstallationInstructions
Foradditionalquestionsorconcerns,pleasecallMohawkTechnicalServiceat888.387.9881;option3
GeneralInformation
Itisimportantthatflooringproductsmaintainpropertemperaturebefore,during,andafterinstallationinorderto
minimizedimensionalchanges.Thesubfloor,allflooringmaterial,andtheadhesivemust
beconditionedataconstant
temperaturebetween65˚F(18˚C)and85˚F(29˚C)for48hourspriorto,during,and48hoursafterinstallation.
Thereafter,maintainaroomtemperaturebetween55˚F(13˚C)and100˚F(38˚C).
Whenusingflooringfromtwoormorecartons,
makesurepatternandrunnumbersfoundonthecartonarethesame.
Thisinformationisstenciledontheoutsideofeachcarton.
Toolsandmaterials
MohawkrecommendedLVTAdhesive
Mohawkrecommendedtrowel
100pound,3sectionroller
ChalkLine
Carpentersquare
UtilityKnife
Cuttingboard
Tapemeasure
MoistureMeterorCalciumChlorideTestKit
PreparingtheArea
Removeallfurniture,appliances,andfixturesfromtheroom.
Removeallbindingstripsorotherrestrictivemoldingfromdoorways,walls,etc.
Undercutwooddoorcasingswherepossiblesothatflooringcan
beslidunderit
SubfloorPreparation
AsbestosWarning
WARNING! DO NOT MECHANICALLY CHIP OR PULVERIZE EXISTING RESILIENT FLOORING, BACKING, LINING FELT,
ASPHALTIC“CUTBACK”ADHESIVESOROTHERADHESIVES.Previouslyinstalledresilientfloorcoveringproductsandthe
asphaltic or cutback adhesives used to install them may contain either asbestos fibers and/or crystalline
silica. The
products in this carton DO NOT contain asbestos or crystalline silica.Avoid creating dust. Inhalation of asbestos or
crystalline dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos fibers greatly
increasestheriskofseriousbodilyharm.Unlesspositivelycertainthatthepreviouslyinstalledproductisanon‐asbestos
containing material, you must presume it contains asbestos. Regulations may require that the material be
tested to
determineasbestoscont entand maygoverntheremoval anddisposalofmaterial.SeecurrenteditionoftheResilient
FloorCoveringInstitute(RFCI)publication“RecommendedWorkPracticesforRemovalofResilientFloorCoverings”for
detailedinformationandinstructionsonremovingallresilientcoveringstructures.





