Installation Instructions
STONE INSTALLATION INSTRUCTIONS
SURFACE PREPARATION TABLE 1
WALL SYSTEM/BACK UP
PREPARATION REQUIREMENTS
CLEANING
2 LAYERS
WRB
LATH
SCRATCH
COAT
ROUGHEN/
TEXTURE
NOTES
WOOD FRAME 
16"oc
SHEATHING
✓ ✓ ✓
N/A
PLYWOOD
✓ ✓ ✓
N/A
OSB
✓ ✓ ✓
N/A
CEMENT 
BOARD
✓
OPTIONAL
✓
N/A
Requires modified mortar to 
bond units. Proprietary 
coatings between bonding 
mortar & cement board may 
compromise warranty.
WALLBOARD
✓ ✓ ✓
N/A
½" FOAM 
BOARD
✓
*
✓ ✓
N/A
METAL FRAME 
16"oc
SHEATHING
✓ ✓ ✓
N/A
EXTERIOR
GYPSUM
✓ ✓ ✓
N/A
OSB
✓ ✓ ✓
N/A
PLYWOOD
✓ ✓ ✓
N/A
½" FOAM 
BOARD
✓
*
✓ ✓
N/A
UNIT MASONRY 
BRICK OR BLOCK
✓
**
OPTIONAL OPTIONAL OPTIONAL
SITE 
EVALUATION
Engineer review 
recommended for existing 
unit masonry.
POURED CONCRETE OR  “TILT 
UP” CONSTRUCTION
✓
**
OPTIONAL OPTIONAL OPTIONAL
✓
See ASTM C1780 for 
roughness eval
uation.
OPEN STUD CONSTRUCTION
✓ ✓ ✓
N/A
48 hour scratch coat cure. 
Use paper backed 3.4 lb
 rib 
lath.
METAL BUILDING
✓ ✓ ✓
N/A
48 hour scratch coat cure. 
Use paper backed 3.4 lb
 rib 
lath.
SPECIAL CONDITIONS
INTERIOR INSTALLATION
✓
**
1 LAYER
✓
OPTIONAL
CONTINUOUS INSULATION
✓
*
✓ ✓
N/A
See TER for lath fastener 
selecti
on available for 
framed or masonry 
applications.
STUCCO
✓
**
✓ ✓ ✓
Engineer review 
recommended for existing 
stucco.
Note: Optional surface preparation utilizing a rainscreen may be added.
**
  Some foam products may qualify as WRB. See foam manufacturer instructions.
**
  Cleaning can be as simple as rinsing dust off the surface with clear water or as involved as bead blasting. You are removing 
form release agents, dirt, paint, sealers or anything that may inhibit bond. This process may also be the method to roughen the surface 
to create bond ready texture. See ASTM C1780 for more information.










