Instructions / Assembly
ILLUSTRATION J
STEP #9
Determine next base cabinet to be installed and repeat measuring, pre-drilling and installa-
tion but again, do not fully tighten. Carefully align the face frames of each cabinet with each 
other and “C”-clamp together (ILLUSTRATION F). Drill a 3/32” pilot hole in three places 
along hinge side of frame and secure with #8 x 2-1/2” trim screws. Continue around the 
room until all base cabinets and fillers have been installed. Return to each cabinet for one 
last check of level and plumb and tighten screws.
NOTE: You will need to create cutouts for electrical and plumbing in some cabinets. Carefully measure 
each location and transfer to BACK of cabinet. Accurately cut holes BEFORE installing cabinetry.
STEP #10
You may now install any tall cabinets (ILLUSTRATION I), base end panels or tall refrigera-
tor panels, if included in your design. Tall cabinets are installed in the same manner as wall 
and base cabinets. If your tall cabinet requires an end panel skin, attach to end panel before 
installing cabinet (ILLUSTRATION J).
NOTE: If you are installing an oven cabinet, be sure to 
consult the appliance manufacturer’s installation 
instructions for cutout size and additional bracing or 
reinforcement requirements.
Base end panels and tall refrigerator panels are 
installed in the same manner. Determine location of 
panel and draw a line on floor that represents the 
INSIDE edge of the end panel. Attach a wood “cleat” 
to floor to create an anchor point for securing end 
panel. Attach three (3) “L” brackets to panel at back. 
Test fit panel and determine if there is a stud where 
“L” brackets will attach to wall. If no stud is present, 
install plastic wall anchors.
You are now ready to install skins and matching toe 
kick cover. This is a simple measure and cut operation. 
Attach matching skins or toe kick cover with finish 
nails or pin gun. Construction adhesive may be used 
as an alternative (ILLUSTRATION J).
ILLUSTRATION I
4
Finishing Nails
C-clamps






