BOILER INSPECTION AND MAINTENANCE SCHEDULE
Inspection Activities
Piping
1st Year 2nd Year 3rd Year 4th Year*
Near Heater Piping Check heater and system piping for any sign of leakage, verify proper support
Vent Check condition of all vent pipe and joints and supports. Note any deterioration and replace.
Gas Check gas piping, test for gas leaks and signs of aging, make sure all pipes are supported properly.
Visual
Do a full visual inspection of all system components. Pay close attention to clearances of venting. Make
sure intake and exhaust screens are clean and clear of obstructions.
Functional Test all functions of the system (Heat, Set Point, Safeties)
Temperatures
Verify safe settings on Super-Stor storage tank or Anti-Scald Valve (see part 12 for related safety
warnings)
Connections Check wire connections, make sure they are tight
Circuit breakers Check to see that the circuit breaker is clearly labeled, exercise circuit breaker
Switch and Plug Verify ON/OFF switch and convenience plug are both functional
Smoke and CO detector Verify devices are installed and working properly, change batteries if necessary
Combustion Chamber Vacuum Debris from Combustion Chamber if Necessary
Combustion Chamber
Check burner tube, and combustion chamber coils, clean according to maintenance section of manual.
See procedure to clean heat exchanger Part 13.
Spark Electrode Clean with Scotch Brite pad, Set gap at 1/4" (see Fig 14-2 Part 14 in Troubleshooting section)
Flame Probe
Clean with Scotch Brite pad, Check flame current in μA (d7 on status menu in Start-up Procedures)
record high fire (7-9 typical) and low fire (2-6 typical)
* NOTE : CONTINUE MAINTENANCE BEYOND THE 4TH YEAR IS REQUIRED ON A YEARLY BASIS.
Date last completed
System
Electrical
Chamber and Burner
GAS-FIRED HOT WATER SUPPLY BOILER Boiler Manual