BOILER START UP REPORT
Light Off Activities
1) Fill the heating system Check all piping and gas connections, verify they are all tight
Pressurize System _____PSI
Add Water to prime condensate system
____%
Verify near heater piping and flue are properly supported
2) Check Gas Pipe Leak test using locally approved methods (consult jurisdictional code book)
Check incoming gas pressure (3.5" to 14" W.C.) ____in w.c. Static
What is the "drop" on light off (No more than 1" W.C.) ____in w.c. Dynamic
3) Record Ionization Current Check μA reading at d7 on the status menu (see start-up section) ____ μA High Fire ____ μA Low Fire
4) Verify System Operation Turn up aquastat on storage tank to verify wiring connections
5) Check Combustion Check and adjust (if necessary) carbon dioxide content ____% CO2 High Fire ____%CO2 Low Fire
Check and adjust (if necessary) carbon monoxide content ____ppm CO High Fire ____ppm CO Low Fire
____*8 ____*9 ____*10 ____*11
System Setting Verifty system settings ____de ____dh
Check Mixing Valve
Notes:
Date completed _______________