User manual

INSTALLATION
6
INSTALLATION
INTRODUCTION
The correct and careful installation is the first
and fundamental step in achieving the good
demineralizer operation, long life and complete utilization of its features.
Moreover, this precaution will avoid the danger for physical injury or property damage, not
to mention equipment malfunctions and faults. So, please follow the instructions in this
chapter scrupulously
.
NOTE
T
HE TECHNICAL SERVICE (SEE APPENDIX Z) IS AT YOUR DISPOSAL FOR ANY
DOUBT YOU MAY HAVE OR FURTHER INFORMATION YOU MAY REQUIRE
.
THE DEMINERALIZER HAS PASSED THE REQUIRED TESTS BEFORE BEING
DELIVERED
. SO IT DOES NOT REQUIRE ANY ADDITIONAL CALIBRATION AT THE
GETTING IN SERVICE
.
POWER SUPPLY
The electrical system the demineralizer will be connected to, must be suitably dimensioned
basing on the power requirements of the device. See the nameplate located on the
backside of the equipment.
WARNING
VERIFY THE ELECTRIC PLANT’S CONFORMITY, AND THAT IT IS
GROUNDING PROVIDED.
SIZE OF
EMBEDDING
CHAMBER
When installing the demineralizer inside a cabinet, adequate space all around the device
must be foreseen in order to provide an effective ventilation, as well as an opening in the
back to allow the passage of the power cord and piping.
The built-in compartment should have the following minimum dimensions:
- Height 280 mm
- Width 270 mm
(free space on the ventilation grid
side)
- Depth 480 mm
(plus a space for rear connections
and front panel view)
WARNING
COMPARTMENT DIMENSIONS LESS THAN THOSE SHOWN MAY
COMPROMISE THE CORRECT AIR CIRCULATION AROUND THE
DEVICE AND AN ADEQUATE COOLING, CAUSING CONSEQUENT
PERFORMANCE DETERIORATION AND/OR POSSIBLE DAMAGE.
NOTE
I
F THE MAINS SWITCH REMAINS INACCESSIBLE, USE A MAINS SOCKET
INCORPORATING AN ON
/OFF SWITCH.
REFER TO APPENDIX A (TECHNICAL CHARACTERISTICS) FOR COMPLETE
TECHNICAL DATA
.
280
270
480