Users Manual Part 2

Vehicle Monitoring and Locating System Mobile Video Computing Solutions LLC
Tow Truck Installation Procedures
21 September 21, 2021
and rearward and measure that the distance between these two points never exceeds
6’ at any time.
4) Attach the chassis end of the coiled cable (with the 5M straight Ethernet cable) to a ¼”
bolt. Do not tighten yet.
5) Attach the bed end of the coiled cable to a ¼” bolt. Do not tighten yet.
6) Have someone else move the bed slowly while you closely watch the coiled cable
behavior throughout full motion of stowed through extended and back to stowed position.
Watch for any snagging or rubbing on any vehicle components. If you see anything other
than brief contact which won’t snag, one or both ends of the coiled cable need to be
moved. Ensure that the coiled cable is never extended beyond 6’ in length.
7) Position each coiled cable clamp and connector to orient the coiled cable in the most
ideal direction to minimize overflexing the coiled cable throughout movement and
tighten the bolt and nut securely. Repeat the procedure of extending and stowing the bed
to ensure the cable is not snagging on anything.
8) Route 5M Ethernet cable inside chassis rails to the MDVR location inside cab and ziptie
every 1-2’.
Preferred Coiled Cable Mounting Locations
Coiled Cable Installed