Specifications
3 / 9
◇ Mounting Layout
Sliding assembly structure will be applied with its external case hook (Separate Bracket will not be applied)
Mounting Proposal : 1st slot in the EC(Electrical Center)
In order to meet RKE(RF) Operation Distance with 40M, Seoyon proposes the minimization of interruption
made by metal material at RF radiated field
Necessary to have 53mm separation from SCIM conductor material (Ideal Distance is more than 86mm)
< MOUNTING Proposal >
<REFERENCE UNIT VIEW>
◈ SCIM UNIT
Mounting Point
SCIM PACKAGE Configuration
1









