Chainsaw User Manual
MK CX-3  Revision 09/04, Effective Date September 17, 2004  Page 35 
MAINTENANCE AND TROUBLESHOOTING 
14. Micro-V Belt, Adjustment and Replacement:   
In order to ensure the CX-3 operates at peak efficiency, the power transmission Micro-V belt should be 
inspected monthly and changed if any signs of damage and/or excessive wear is observed. 
NOTE:  1.  When a new belt is installed, it should be inspected and re-tensioned after the first forty-eight 
(48) hours of operation. 
(E) 
Locate the 4 upper Engine 
Mounting Nuts on both ends of 
the CX-3 motor 
(G) 
Loosen the Engine Mounting 
Bolts using two 1/2-inch wrenches 
(C) 
Inspect the V-belt for excessive 
wear, cracks and cuts – if worn, 
proceed to Step E 
(B) 
Locate and remove the Belt Guard
Retaining Screws using a 7/16-
wrench and then remove the Belt 
Guard 
(H) 
Loosen the Motor Tension Arm 
using a 1/2-inch Wrench 
(D) 
Check V-belt for proper tension if 
tension is correct, go to Step R 
(Proper tension is approximately 
1/8-inch deflection of the belt) 
Inspect 
V-
b
el
t
(A) 
Remove the Blade 
(See Blade Removal /Installation 
section) 
Diamond 
Blade 
(F) 
Locate the 4 Lower Engine 
Mounting Bolts on both ends of 
the CX-3 motor 
(I) 
Push the Motor forward to loosen 
the Micro-V belt 
7-16” 
Wrench
Turn counter- 
clockwise to 
loosen
Check Tension 1/2-way 
between pulleys 
Mounting 
Nuts
Mounting 
Bolts 
Rotate counter-
clockwise to loosen 
Tension 
Ar
m
Direction of Push










