Owner Manual

STEP 9:
16
©
2012 Escalade Sports
For Customer Service Call 1-866-556-2757
With the help of four adults, carefully rotate the rail and apron assembly and then place over the play
bed as shown. From the underside of the table, insert H12 Bolts with H13 Washers up through the
play bed and into the threaded inserts of each rail. Be sure the rail assembly is aligned with the play
bed and pockets, then tighten all bolts.
H13
H12
H13
H12
Figure 17
PARTS REQUIRED:
18 pcs - H12 Bolt
18 pcs - H13 Washer
All Rights Reserved.
Important Note : Once Rail and Apron assembly is placed onto the playfield - carefully sight down
onto each pocket opening and adjust rail and apron assembly equal to all six pocket openings
before tightening H12 bolts.
IMPORTANT NOTE: Make sure this P14 End Apron with Ball
Return Opening is on same end as P16 Ball Return Support
Board assembled in STEP 2.
P14