User manual
EN-17
6. Schedule setting
6.1. Creation of projector group
Multiple projectors can be controlled and batched by sorting groups.
Also,eachgroupcanseteachtimeofthepowersupplyON/OFFeveryday.
SincethescheduleofthepowersupplyON/OFFisperformedbyeachgroup,theprojectorwhichyouliketo
operate at the same schedule should be integrated into the same group.
When Power ON and Power OFF are enabled, their time settings are indicated on the schedule list.
[Example] Whensettingthescheduleforthegroup“group1”toturnthepowersupplyONat9:00onMonday,
turningOFFat17:00onthesameday,ONat8:30onThursday,andOFFat17:40onFriday.
TimeofpowersupplyON/OFF
Group name
Day of the week
Time of power supply ON
Time of power supply OFF
When validating the setting,
putacheckmarkinthebox.
Schedule list
(1) Select “Add New Group” from “Configuration” of the menu bar.
• “AddNewGroup”windowisdisplayed.
(2) Input the group name to be created in the “Group Name” column (within 16 characters in
one-byte alphanumeric symbol).
(3) Select the day of the week to be set for the time of the power supply ON/OFF.
(4) Only when setting the time of the power supply ON, set the time in the “Power ON” column,
and put a check mark in the “Enable” box.
(5) Only when setting the time of power supply OFF, set the time in the “Power OFF” column,
and put a check mark in the “Enable” box.
(6) When there are more than one day of the week to be set for the power supply ON/OFF
schedule, repeat the procedure (3) to (5).
(7) Click [Add].