Indoor Installation Manual
Table Of Contents
- SVZ-KP12,18, 24, 30, 36NA
- Table of Contents
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspect shipment
- 3. Safety precautions
- 4. Indoor unit accessories
- 5. Selecting an installation site
- 6. Combining indoor units with outdoor units
- 7. Installing the unit
- 8. Side Return
- 9. Duct connection
- 10. Mount positions
- 11. Air filter
- 12. Refrigerant piping work
- 13. Drain connections
- 14. Electrical wiring
- 15. Test run
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspection du matériel livré
- 3. Mesures de sécurité
- 4. Accessoires de l’appareil intérieur
- 5. Sélection de l’emplacement d’installation
- 6. Combinaison des appareils intérieurs et extérieurs
- 7. Installation de l’appareil
- 8. Retour latéral
- 9. Raccordement des conduits
- 10. Positions de montage
- 11. Filtre à air
- 12. Travaux de tuyauterie de frigorigène
- 13. Raccordements de vidange
- 14. Câblage électrique
- 15. Essai de fonctionnement
- 15.1. Avant l’essai de fonctionnement
- 15.2. Essai de fonctionnement
- 15.3. Autotest
- 15.4. FONCTION D’AUTOREDÉMARRAGE
2" Min.
Anti-syphon
air vent
2" Min.
2" Min.
Vent T
Drain Trap
NOTE
Horizontal runs must also have an anti-siphon air vent (standpipe) install ahead of the hori-
zontal run to eliminate air trapping. Horizontal drain lines must be pitched a minimum ¼”
per foot.
Route the drain lines outside or to an appropriate drain. Drain lines must be installed so
they do not block service access to the front of the unit. 24” clearance in the front is for
routine maintenance or service.
NOTE
Check local codes before connecting the drain line to an existing drainage system.
Insulate the drain lines where sweating could cause water damage. Upon completion of in-
stallation, it is the responsibility of the installer to ensure the drain pan(s) captures all con-
densate, and all condensate is draining properly and not getting into the ductwork/system.
Vertical Mounting:
When mounted vertically, the air handler’s primary drain connection is located in the center of the unit. The
slightly higher drain to the left is the secondary drain.
Attach the drain connector and tighten
TO THE PROPER TORQUE SHOWN PREVIOUSLY with sealant
and install the drain line.
SVZ-KP12,18, 24, 30, 36NA
Specifications are subject to change without notice. 39 © 2022 Mitsubishi Electric US, Inc.
ENGLISH