Indoor Installation Manual
Table Of Contents
- SVZ-KP12,18, 24, 30, 36NA
- Table of Contents
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspect shipment
- 3. Safety precautions
- 4. Indoor unit accessories
- 5. Selecting an installation site
- 6. Combining indoor units with outdoor units
- 7. Installing the unit
- 8. Side Return
- 9. Duct connection
- 10. Mount positions
- 11. Air filter
- 12. Refrigerant piping work
- 13. Drain connections
- 14. Electrical wiring
- 15. Test run
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspection du matériel livré
- 3. Mesures de sécurité
- 4. Accessoires de l’appareil intérieur
- 5. Sélection de l’emplacement d’installation
- 6. Combinaison des appareils intérieurs et extérieurs
- 7. Installation de l’appareil
- 8. Retour latéral
- 9. Raccordement des conduits
- 10. Positions de montage
- 11. Filtre à air
- 12. Travaux de tuyauterie de frigorigène
- 13. Raccordements de vidange
- 14. Câblage électrique
- 15. Essai de fonctionnement
- 15.1. Avant l’essai de fonctionnement
- 15.2. Essai de fonctionnement
- 15.3. Autotest
- 15.4. FONCTION D’AUTOREDÉMARRAGE
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
①
① Rubber Plugs
Step. 10c Remove the plugs indicated in the image above.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
①
②
③
① DETAIL A
② 2 Plastic tier per
sides
③ 2 Plastic tubes en-
sure tubes drain into
Drain Pan
Step. 10d Next, install the clear plastic tubes which are included in the accessory bag. Ensure the
plastic tubes drain into the pan. Also, be sure the clear plastic tubes do not have any restriction. Cut-
ting of the plastic tube is required, please refer to the table for length. Finally, secure the clear plastic
tubes to the top drain pan per Detail A then to the metal brackets supporting the coil to the top drain
pan with the provided plastic ties as shown.
SVZ-KP12,18, 24, 30, 36NA
Specifications are subject to change without notice. 29 © 2022 Mitsubishi Electric US, Inc.
ENGLISH