Indoor Installation Manual

Table Of Contents
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
8
NTS
GRADE
FINE COARSE
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
Plate Guide Rear
Side Drain Pan
Piping
Step. 10b Reinstall the brackets to the opposite side of the Side Drain Pan. The Side Drain Pan will be
reinstalled on the opposite side of the Coil Assembly. Reattach the Plate Guide Rear on the opposite
side of the coil assembly.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
1:5
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
RUBBER PLUGS
PLASTIC TUBES
ENSURE TUBES DRAIN
INTO DRAIN PAN
Completed Step. 10b
View Horizontal Left Coil Assembly.
SVZ-KP12,18, 24, 30, 36NA
© 2022 Mitsubishi Electric US, Inc. 28 Specifications are subject to change without notice.
ENGLISH