Indoor Installation Manual
Table Of Contents
- SVZ-KP12,18, 24, 30, 36NA
- Table of Contents
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspect shipment
- 3. Safety precautions
- 4. Indoor unit accessories
- 5. Selecting an installation site
- 6. Combining indoor units with outdoor units
- 7. Installing the unit
- 8. Side Return
- 9. Duct connection
- 10. Mount positions
- 11. Air filter
- 12. Refrigerant piping work
- 13. Drain connections
- 14. Electrical wiring
- 15. Test run
- SVZ-KP12,18, 24, 30, 36NA
- 1. Dimensions
- 2. Inspection du matériel livré
- 3. Mesures de sécurité
- 4. Accessoires de l’appareil intérieur
- 5. Sélection de l’emplacement d’installation
- 6. Combinaison des appareils intérieurs et extérieurs
- 7. Installation de l’appareil
- 8. Retour latéral
- 9. Raccordement des conduits
- 10. Positions de montage
- 11. Filtre à air
- 12. Travaux de tuyauterie de frigorigène
- 13. Raccordements de vidange
- 14. Câblage électrique
- 15. Essai de fonctionnement
- 15.1. Avant l’essai de fonctionnement
- 15.2. Essai de fonctionnement
- 15.3. Autotest
- 15.4. FONCTION D’AUTOREDÉMARRAGE
3.5. Before starting the test run
CAUTION
• Turn on the power at least 12 hours before starting operation.
– Starting operation immediately after turning on the main power switch can result in se-
vere damage to internal parts. Keep the power switch turned on during the operational
season.
• Do not touch the switches with wet fingers.
– Touching a switch with wet fingers can cause electric shock.
• Do not touch the refrigerant pipes during and immediately after operation.
– During and immediately after operation, the refrigerant pipes may be hot or may be
cold, depending on the condition of the refrigerant flowing through the refrigerant pip-
ing, compressor, and other refrigerant cycle parts. Your hands may suffer burns or
frostbite if you touch the refrigerant pipes.
• Do not operate the air conditioner with the panels and guards removed.
– Rotating, hot, or high-voltage parts can cause injuries.
• Do not turn off the power immediately after stopping operation.
– Always wait at least five minutes before turning off the power. Otherwise, water leak-
age and trouble may occur.
SVZ-KP12,18, 24, 30, 36NA
Specifications are subject to change without notice. 13 © 2022 Mitsubishi Electric US, Inc.
ENGLISH