Specifications
-
53
-
Wall
Gutter
Pipes storage area
¡ When conducting the central rear piping, use a nipper to cut out
knock-out holes in the installation board.
¡ Do not place the power supply cords
above the gutter, because the air con-
ditioner is structured in a way where
condensation on the back side is col-
lected in to the drain pan before
drainage.
Indoor unit
Hook (2 locations)
Installation
board
Instalation
board
Indoor unit
base lower hook
Wall
Installing steps
Declining slope
Inverted slipe
Trap
Catch position marks on the bottom
of the indoor unit's base
Lid (right)
¡ Do not make traps in the drain hose line.
5 Securing the indoor unit to the installation board
a To remove the indoor unit from the mounting plate.
¡ Remove the left and right lids.
¡ Use your fingers to pull down the catches (left and right) at the bottom of the indoor unit's base, indicated by the catch
position marks. (The catches on the indoor unit's base are released from the mounting plate.)