Specifications
-
10
-
’13 • SC-T-192
For safety reasons, please use the round crimping terminals with insulated sleeves for connecting all wires to the central control.
Please do the grounding work. Please do not connect earth line with gas pipes, water pipes, lightning rods and grounding line of
telephone.
Please do not turn on the power supply (local switch) until all of the work is completed.
Please wait at least two minutes after the indoor and outdoor units are turned on before turning on the power supply.
Except for the central control in the figure all of the components are obtained at the site (wires, switches, relays, power supply, lamps,
etc.)
Please be sure to build the circuit breaker which is easily accessible with building equipment’s wiring.
Pease be sure to use the supplied round crimped terminals when connecting wires to the power supply terminal block and Super Link
terminal block.
Before connecting the wires, remove the cover of the terminal block. After the work is completed, fix the cover of the terminal block as
before. The cover is used to prevent electric shock due to accidental contact.
Please use a gas meter or watt-hour meter, demand input device and emergency stop input device which comply with a relevant IEC
Safety Standard.
Wiring Outline
Grounding
work
The calculating data taken out by way of USB memory
(accessory of SC-SL4-BE)
Emergency stop signal input
LAN
Grounding work
Local switch
L1, L2
Demand signal input (2 points)
Power pulse input from gas meter or watt-hour meter
(8 points) (in case of SC-SL4-BE)
Power supply
AC100-240V
50/60Hz
Power
supply
Power
supply
3 Super Link systems
Operation output
Malfunction output
Wiring Specification
Power supply wire 1.25mm
2
Local switch 10A
Super Link signal wire
(Note 1, Note 2)
Shielded wire (double-core, 0.75mm
2
- 1.25mm
2
).
Max. 1000m per line (Max. distance: 1000m, Total wire length: 1000m)
The wire for operation output, error output,
emergency stop and demand input
Shielded wire (double-core, 0.75mm
2
- 1.25mm
2
).
Maximum length: 200m per system
The wire for gas meter or watt-hour meter Shielded wire (double-core, 0.75mm
2
- 1.25mm
2
).
Maximum length: 200m per system
Grounding wire 0.75mm
2
- 6mm
2
Note 1: When this central control is used, use a shielded wire for the Super Link signal wire. Ground both ends of the shielded wire.
(Please wire the ground of the central control at Ground position “b” of “System Wiring” in the diagram)
Note 2: If the indoor and outdoor units connected to the network are all compatible units with New Super Link, a total wire length of 1500m per line is
possible (maximum distance: 1000m). However, be sure to use a 0.75mm
2
wire diameter if the total wire length exceeds 1000m. For further
information, please contact your sales representative or dealer.
Installation procedure
(1) Remove the upper case
Take out two screws using a ①
cross slot screwdriver. (Do not
lose the screws)
Pull the upper case a little ②
forward and push above. Then,
upper case can be removed.
Caution
Please do not install
facing upward or at
a slant.
Allowed Not allowed Not allowed
Embed signal wire and power supply wire in the
●
wall beforehand.
Connect wires to the terminal block.
●
Confirm power supply voltage and connect
●
correctly.
③
②
①
Installation outline(2)
Be sure to use the attached installation ●
brackets.
Wall
LCD
Central
control
Installation
bracket (front)
Installation
bracket
(rear)
Upper
case
M3 pan head screw × 4 positions
Fasten the central control to the front side of the control box or a hole •
in the wall using the M3 screws.
Wire separately the power supply wire and the signal wire for •
preventing malfunctions.
●
●
●
●
●
●
●
●
10. ELECTRIC WIRING