PVA Installation Manual
Table Of Contents
- PVA-A12, 18, 24, 30, 36, 42 AA7
- Contents
- 1. Dimensions
- 2. Inspect shipment
- 3. Safety precautions
- 4. Indoor unit accessories
- 5. Selecting an installation site
- 6. Combining indoor units with outdoor units
- 7. Installing the unit
- 8. Duct connection
- 9. Mount positions
- 10. Air filter
- 11. Refrigerant piping work
- 12. Drain connections
- 13. Electrical wiring
- 14. Test run
- Table des matières
- 1. Dimensions
- 2. Vérification de la livraison
- 3. Consignes de sécurité
- 4. Accessoires de l’appareil intérieur
- 5. Sélection de l’emplacement d’installation
- 6. Combinaison des appareils intérieurs avec des appareils extérieurs
- 7. Installation de l’appareil
- 8. Raccordement des conduits
- 9. Positions de montage
- 10. Filtre à air
- 11. Mise en place des tuyaux de réfrigérant
- 12. Raccords d’évacuation
- 13. Câblage électrique
- 14. Essai de fonctionnement
- Back Cover
12
Step.12
A. Unplug the Thermistor (CN44) from the control board and route
the harness from control box area out through the rubber grommet.
B. Remove the brackets which secure the coil assembly if not
already done.
C. Slide the coil assembly out of the air handler cabinet.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
8
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
Step.13 Remove the Plate Guide Rear (3 screws) and Side Drain
Pan (4 screws) along with supporting brackets (4 screws) from the
coil assembly.
A
B
PLATE GUIDE REAR
SIDE
DRAIN
PAN
C
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
18
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
5/8”
(15mm)
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DETAIL B
PLASTIC TIE
PLASTIC TUBE
PLASTIC TIE
PLASTIC TUBE
CORRECT INCORRECT
DETAIL B
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
18
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
5/8”
(15mm)
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DETAIL B
PLASTIC TIE
PLASTIC TUBE
PLASTIC TIE
PLASTIC TUBE
CORRECT INCORRECT
DETAIL B
Step.14a Install the (2) drain pan seals included in the accessory
bag as shown above. These seals will cover the unused holes in the
side drain pan to prevent leaks.
DETAIL B
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16151413121110
987654321
16151413
121110
987654321
SCALE
8
NTS
COMMERCIAL TOLERANCE
WORK GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING
A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
ED
CBA
MITSUBISHI ELECTRIC CORPORATION
DATE APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
Step.14b Reinstall the brackets to the opposite side of the Side
Drain Pan. The Side Drain Pan will be reinstalled on the opposite
side of the Coil Assembly. Reattach the Plate Guide Rear on the
opposite side of the coil assembly.
PIPING
PLATE
GUIDE
REAR
SIDE
DRAIN
PAN