Specs

PUY-A12NKA7(-BS)
14
PUZ-A12NKA7 PUZ-A18NKA7 PUY-A12NKA7 PUY-A18NKA7
PUZ-A12NKA7-BS PUZ-A18NKA7-BS PUY-A12NKA7-BS PUY-A18NKA7-BS
6
OUTLINES AND DIMENSIONS
1/2 conduit hole
144<5-21/32>
2-{22.2<7/8>
22<7/8>
38<1-1/2>241<9-1/2>
Min.100mm<3-15/16>
Piping and wiring connection can
be made from the rear direction only.
*1 In the place where short cycle tends to occur, cooling and heating capacity and power consumption might get lowered 10%.
Air outlet guide (optional PAC-SG58SG-E) will help them improve.
*2 If air discharges to the wall, the surface might get stained.
2 sides should be open in
the right, left and rear side.
Min.100mm<3-15/16> as long as
no obstacle is placed on the
rear and light-and-left sides
of the unit
*1
*2
*1
Air intake
Air discharge
4-oval hole
Air intake
Service panel
Connection for liquid pipe
Service panel for charge plug
Service port
Connection for gas pipe
Min.100mm<3-15/16>
Min.500mm<19-11/16>
Min.350mm<13-25/32>
Basically
open
Max.
<Foundation bolt height>
FOUNDATION
Please secure the unit firmly
with 4 foundation M10<W3/8> bolts.
(Bolts, washers and nut must
be purchased locally.)
18mm<23/32>
{33<1-5/16> drain hole
43.6<1-23/32>
152<6>
155
400<15-25/32>
347.5<13-11/16>
45.4<1-25/32>
365<14-3/8>
330<13>
300<11-13/16>
40<1-9/16>
Handle
600<23-5/8>
10<3/8>
300<11-13/16>
150<5-29/32>
287.5<11-11/32>
500<19-11/16>
800<31-1/2>
69<2-23/32>
183<7-7/32>
90<3-17/32>
155<6-3/32>
23<29/32>
32.5<1-9/32>
18<23/32>
FLARE {12.7<1/2>
FLARE {6.35<1/4>
Installation bolt pitch
PIPING-WIRING DIRECTION
Minimum installation space for outdoor unit
Free space around the outdoor unit
(basic example)
FOUNDATION BOLTS
Unit: mm<in>
Air discharge
Air intake
Air intake
oval hole
2-10×21
drain hole
ø 42
2-U Shaped notched holes
(Foundation Bolt M10<W 3/8>)
(Foundation Bolt M10
<W 3/8>)
330<13>
300<11-13/16>
40 <1-19/32>
404.5<15-15/16>
48<1-29/32>
360<14-3/16>
32.5<1-9/32>
500<19-11/16>
Min.500mm
<19-11/16>
Min.100mm
<3-15/16>
Service port
FLARE 12.7 (1/2F)
Connection for
gas pipe
FLAREø
ø
6.35 (1/4F)
Connection for
liquid pipe
Service panel
for charge plug
Service panel
Earth terminal
Terminal connection
Left
...
Power supply wiring
Right
...
Indoor/Outdoor wiring
23.2<15/16>
99.5<3-15/16>
164.5<6-1/2>
492<19-3/8>
185.5 <7-5/16>
43
°
35
°
2-
ø
22.2<7/8>
1/2 conduit hole
Installation bolt pitch
Handle for moving
22 <7/8>
320<12-5/8>
809 <31-7/8> 62 <2-15/32>
154.5 <6-3/32>
310 <12-7/32>
8.5<11/32>
22.3 <29/32>
630 <24-13/16>
Min.100mm
<3-15/16>
Basically open
Min.350mm
<13-25/32>
Max.
<Foundation bolt height>
18 mm<23/32>
Free space around the outdoor unit
(basic example)
100mm<3-15/16> or more as long as
no obstacle is placed on the
rear and right-and-left sides
of the unit
2 sides should be open in
the right, left and rear side.
Please secure the unit firmly
with 4 foundation (M10<W3/8>) bolts.
(Bolts, washers and nut must
be purchased locally).
FOUNDATION BOLTS
Piping and wiring connection can
be made from the rear direction only.
PIPING-WIRING DIRECTION
FOUNDATION
OCH636
FORM#PVA-A12AA7 / PUY-A12NKA7(-BS) - 201810
1340 Satellite Boulevard, Suwanee, GA 30024
Toll Free: 800-433-4822 www.mehvac.com
DIMENSIONS: PVA-A12AA7 & PUY-A12NKA7 (-BS)
Specifications are subject to change without notice. © 2018 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.