User manual
EN-16
6. Schedule setting
6.1. Creation of projector group
Multiple projectors can be controlled and batched by sorting groups.
Also,eachgroupcanseteachtimeofthepowersupplyON/OFFeveryday.
SincethescheduleofthepowersupplyON/OFFisperformedbyeachgroup,theprojectorwhichyouliketo
operate at the same schedule should be integrated into the same group.
When Power ON and Power OFF are enabled, their time settings are indicated on the schedule list.
[Example] Whensettingthescheduleforthegroup“group1”toturnthepowersupplyONat9:00onMonday,
turningOFFat17:00onthesameday,ONat8:30onThursday,andOFFat17:40onFriday.
Group name
Day of the week
Time of power supply ON
Time of power supply OFF
When validating the setting,
putacheckmarkinthebox.
Schedule list
TimeofpowersupplyON/OFF
(1) Select “Add New Group” from “Configuration” of the menu bar.
• “AddNewGroup”windowisdisplayed.
(2) Input the group name to be created in the “Group Name” column (within 16 characters in
one-byte alphanumeric symbol).
(3) Select the day of the week to be set for the time of the power supply ON/OFF.
(4) Only when setting the time of the power supply ON, set the time in the “Power ON” column,
and put a check mark in the “Enable” box.
(5) Only when setting the time of power supply OFF, set the time in the “Power OFF” column,
and put a check mark in the “Enable” box.
(6) When there are more than one day of the week to be set for the power supply ON/OFF
schedule, repeat the procedure (3) to (5).
(7) Click [Add].