Base Heater PAC-SJ20BH-E
square hole for
motor support
base heater
hole to mount
the base heater
hole to mount
the base heater
[167mm]
6-9/16[inch]
[167mm]
6-9/16[inch]
square hole for
motor support
base heater
hole to mount
the base heater
hole to mount
the base heater
[167mm]
6-9/16[inch]
[167mm]
6-9/16[inch]
screws
4×10
screws
4×10
heater supports heater supports
screws
screws
4×10
screws
4×10
base heater cover (1)
base heater cover (2)
base heater cover (1)
base heater cover (2)
3 Mounting the base heater
Temporarily place the base heater
on the base so that the square hole for
the motor support on the base comes
to the center of the base heater
.
(See photo below.)
Fix the base heater
with the heater
supports
and the screws 4×10 .
4
Mounting the base heater cover
6 Securing the lead wires
Place the base heater covers
,
as shown in
the right photo.
Fix them with the screws 4×10
.
• Make sure to install the base heater covers
,
in the outdoor unit mounted with a two-row
heat exchanger. The base heater covers
,
cannot be installed in the outdoor unit mounted
with a three-row heat exchanger.
Fix the lead wires of the base heater to the
motor support with a cable tie
at the
position shown in the picture.
Bundle the lead wires of the base heater and
the fan motor together with clamps.
Fix the lead wires with a cable tie
.
Pass the lead wires through the circular hole
on the separator toward the electrical box.
• Secure the lead wires so they will not interfere
with the propeller fan.
5
Mounting the base heater support
Mount the motor support.
• Make sure that the lead wire is not caught between the bottom of the motor support
and the base.
312