Engineering Manual

Decoration panel with 3D i-see sensor PLP-40EAEU
H
A
D
J
A Main unit
B Corner of drain pipe
C Claw on the main unit
D Grille 1
E Hole on the grille
F Hook for temporary installation
G Screw with captive washer
H Ceiling surface
J No gap
K Adjust the nut of main unit using a wrench,
etc.
Fig. 8
Fig. 10
Fig. 9
Fig. 7
Fig. 6
F
E
D
A
B
C
C
D
G
K
C
B
A
D
G
C
F
E
B
A
A Clamp of the main unit
B Electrical box
C Lead wires of the grille
D CNV connector on the controller board
A CN4Z on the controller board
B CN5Y on the controller board
C Lead wire of i-see Sensor corner panel
D Clamp
E Hole of grille (Pass the lead wire.)
F Screw 3
G i-see Sensor corner panel 4
< The grille temporary installed >
4.2.Temporaryinstallationofthegrille(Fig.6)
Join the corner of drain pipe on the main unit with the corner with hole on the
grille and put them together temporarily by hanging the hook of the grille to the
claw of the main unit.
4.3. Fixing the grille
By tightening the pre-installed screws, x the grille onto the main unit. (Fig. 6)
Note:
Make sure there is no gap between the main unit and the grille or between
the grille and the ceiling surface. (Fig. 7)
If there is a gap between the grille and the ceiling:
With the grille attached, slightly adjust the installation height of the main unit
and clear the gap.
Caution:
• Whentighteningthescrew,makesurethatthetighteningtorqueis2.8
N∙mto3.6N∙m,2.1to2.6ft∙lbs.Neveruseanimpactscrewdriver.
• Aftertighteningthescrew,conrmthatthetwogrillehooks(Fig.6)are
latched onto the hooks on the main unit.
4.4. Wire connection (Fig. 8)
Loose the 2 screws xing the electrical box cover on the main unit, and slide
the cover to open.
Route the lead wire from side of the electrical box.
Make sure to connect a connector for vane motor (white, 20 poles) to CNV
connector (white) on the controller board of the main unit.
Lead wires that lead off the grille must be held together without slack using a
clamp into the electrical box.
4.5. Installation of i-see Sensor corner panel (Fig. 9)
Route the lead wire from the side of electrical box.
Route the lead wire connector (white, 4 poles and white, 5 poles) of the i-see
Sensor corner panel 4 from the side of the electrical box on the main unit and
connect to the connector CN4Z and CN5Y on the controller board.
The remaining lead wire of i-see Sensor corner panel must be held together
without slack using the clamp into the electrical box.
Put the cover back on the electrical box with 2 screws.
Note:
Make sure wires are not caught in the electrical box cover.
The i-see Sensor corner panel should be xed onto the grille 1 with screw 3.
* If the position of the i-see Sensor was changed from default position (Position
3) to the other position, change the function settings. (Refer to Fig. 10)
The i-see Sensor corner panel can not installed on the drain pipe side for the
main unit. (Refer to Fig. 10)
Position 1: (Air outlet identication marks □/□□□□)
Position 2: (Air outlet identication marks □/□□)
Position 3: Default i-see Sensor position (Air outlet identication marks □□/□□□)
Position 1
Position 2
Position 3
Refrigerant pipe
Prohibited installation
position
Drain pipe