Service Manual
OPERATING PROCEDURE PHOTOS
5. Removing the expansion valve
NOTE: Gas recovery is not required if the unit is pumped down.
(1) Remove the top panel and the service panel (Refer to
section 1).
(2) Disconnect the power supply cord and indoor/outdoor
connecting wires.
(3) Remove all the LEV coils.
(4) Detach all the brazed parts of the expansion valves and
pipes.
114
Photo 11
Suction pipe
brazed part
Compressor nuts
LEV coils
Expansion
valves
Discharge pipe
brazed part
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
© Copyright 2014 MITSUBISHI ELECTRIC CORPORATION
Issued: Apr. 2017. No. OBH702 REVISED EDITION-F
Issued: Dec. 2016. No. OBH702 REVISED EDITION-E
Issued: Jul. 2016. No. OBH702 REVISED EDITION-D
Issued: Mar. 2016. No. OBH702 REVISED EDITION-C
Issued: Feb. 2016. No. OBH702 REVISED EDITION-B
Issued: Oct. 2014. No. OBH702 REVISED EDITION-A
Published: Sep. 2014. No. OBH702
Made in Japan Specifications are subject to change without notice.