Service manual

4
1-5. INSTALLATION
1-5-1. Installing the R-Converter Unit (mm)
Parts to procure locally
Suspension bolts or anchor bolts : W3/8 (M10)
Nut : W3/8 (M10)
Washer : W3/8 (M10)
Installing the unit in a ceiling
(1) Install the suspension bolts
Wooden structures
Use tie beams (single storied houses) or second floor
beams (two story houses) as reinforcing members.
Wooden beams for suspending air conditioners must be
sturdy and their sides must be at least 6 cm long if the
beams are separated by not more than 90 cm. The size of
the suspension bolts should be M10 (W3/8). (The bolts are
not supplied with the unit.)
A Ceiling
B Rafter
C Beam
D Roof beam
B* Suspension bolt pitch
Ferro-concrete structures
Secure the suspension bolts using the method shown, or use
steel or wooden hangers, etc. to install the suspension bolts.
E Use inserts rated at 100-150 kg each (procure locally)
F Suspension bolts M10 (W3/8) (procure locally)
G Steel reinforcing rod
(2) Install the R-Converter unit.
Installing the unit on a wall
(1) Install the anchor bolts.
(2) Install the R-Converter unit.
Do not install the refrigerant pipes on top of the unit when
installing the unit on a wall, otherwise condensation can
enter the electrical devices, which can cause an electric
shock or a fire.
OC296--1.qxp 03.6.11 9:46 AM Page 4