Quick start manual
5.2.2 Con fig u ra tion for com mu ni ca tion with GX IEC Devel oper
Gen er ally, posi tion ing con trol is per formed via a CC-Link net work in appli ca tions where an addi -
tional PLC sys tem is used for auto ma tion tasks as well as the inte grated con trol ler in the ampli -
fier. In this exam ple we will thus only pro vide detailed descrip tions of the set tings required to
inte grate the servo ampli fier in your pro ject.
Pro ce dure:
How to open an exist ing pro ject in GX IEC Devel oper:
a
Se lect Net work 1 in the pro ject di rec tory tree in the left win dow.
b
Select CC-Link 2 in the Net work Pa ram e ter box.
c
This opens the win dow Net work pa ram e ters: Set ting the CC-Link list where you can now
en ter the set tings shown in Fig. 5-6 3.
CC-Link Communication Settings Positioning via a CC-Link Network
5 - 36 MITSUBISHI ELECTRIC
Fig. 5-6: Settings re quired in GX IEC De vel oper for CC-Link com mu ni ca tion be tween
the con trol ler and the servo amplifier
3
1
2
(a)
(b)
(c)