Specifications

16
7. Installation procedures
The table below summarizes the procedures for using AHC.
Steps Location Necessary tools
Reference
section
Programming
1
Programming of ALPHA2 using
PC’s programming tool
Office
PC, programming tool (ALVLS Programming
Software)
7-1
2
Programming verification
(simulation function) using PC’s
programming tool
Office PC, programming tool
3
Downloading the program to
ALPHA2
Office or
on site
ALPHA2
*1
, ALPHA2-PC connection cable
(AL-232CAB)
*2
, PC, programming tool
Installation
4
On-site installation of AHC On site AHC (ALPHA2 + AHC ADAPTER) 7-2
Initial settings
and Test run
5
Initial setting of AHC ADAPTER
using Maintenance Tool
On site
(office)
AHC, Maintenance Tool
*3
, PC, MN converter
(CMS-MNG) or Centralized Controller
*4
7-3
6
Test run On site
AHC, Maintenance Tool
*3
, PC, MN converter
or Centralized Controller
*4
, ALPHA2-PC
connection cable, programming tool
*1 Includes the power supply to ALPHA2. (A separate power supply is required for AC and DC types.)
*2 ALPHA2-PC connection cable (AL-232CAB) is an optional part of ALPHA2. Refer to the ALPHA2 manual for details.
*3 Use Maintenance Tool ver. 5.08 or later.
*4 Systems with a Centralized Controller do not require an MN converter (LAN connection). Systems without a Centralized Controller require
an MN converter.
Note: For the details of installation process, refer to the technical manual that came with AHC.