Instruction manual

8.
INSPECTION
8.
INSPECTION
Before starting maintenance/inspection, switch power
off,
and after more than
10
seconds have elapsed, confirm that the voltage
is
safe in the tester or the like.
Otherwise, you may get an electric shock.
/F\WARNING
Any person who is involved in inspection should be fully competent to do the work.
Otherwise, you may get an electric shock. For repair and parts replacement,
contact your safes representative.
I
POINT
I
I
Do
not test the servo ampuer with a megger (measure insulation
resistance), or it may become faulty.
Do
not disassemble andor repair the equipment on customer side.
(1)
Inspection
Check the cables and the hke
for
scratches and cracks. Perform periodx inspection according to
operating condtions.
(2)
Life
The following parts must be changed periodically
as
listed below.
If
any part
is
found faulty, it must be
changed immediately even when it has not yet reached the end
of
its We, which depends on the
operating method and environmental conditions.
Part Name
Life Guideline
Smoothng
capacitor
Relay
(a) Smoothing capacitor
:
Affected by ripple currents, etc. and deteriorates in characteristic. The
100,000
times
10
years
Me
of
the capacitor greatly depends on ambient temperature and
operating conhtions. The capacitor
WLU
reach the end
of
its
Me in
10
years
of
continuous operation in normal air-conhtioned environment.
(b)
Relays
Their contacts
will
wear due to switchng currents and contact faults
occur. Relays reach the end
of
their We
at
cumulative
100,000
switchmg times (switchmg Me), whch depends on the power supply
capacity.
8-
1