Specifications
1 - 13
The following operations are performed for the processes shown on the previous
page.
Description Reference
1)
Understand the product functions and usage,
and related devices and specifications required
for positioning control, to determine the operation
method and design the system.
2)
Install the QD75 onto the base unit, wire the
QD75 and external devices (drive unit, etc.), and
connect the PLC CPU to peripheral devices.
• QD75 User's Manual
(Details)
3)
Using the S/W package for the QD75, set
parameters and positioning data required for the
positioning control to be executed.
•
S/W Package for QD75
Operating Manual
4)
Using the GPP function S/W package, create a
sequence program required for positioning
operation.
•
GPP Function S/W Package
Operating Manual
5)
Write the parameters and positioning data, etc.,
created with the S/W package into the QD75.
•
S/W Package for QD75
Operating Manual
6)
Using the GPP function S/W package, write the
created sequence program into the PLC CPU.
•
GPP Function S/W Package
Operating Manual
7)
Check the connection between the QD75 and
external devices, and test the system to check
whether the designated positioning operation is
executed correctly.
•
S/W Package for QD75
Operating Manual
8)
Carry out test operation to confirm that the
designated positioning operation is executed
correctly.
•
GPP Function S/W Package
Operating Manual
9)
Actually operate the positioning operation. At this
time, monitor the operation state as required. If
an error or warning occurs, take corrective
actions.
•
QD75 User's Manual (Details)
•
S/W Package for QD75
Operating Manual
•
GPP Function S/W Package
Operating Manual
10)
Inspect and service the QD75 as required.
•
QD75 User's Manual