Specifications

5 - 6
5.4 Initialization and Connection Check Using SW
D5C-QD75P
When the positioning system is changed or a new system is installed, initialize the
QD75 and check the I/O signals from the drive module and the external devices.
Also, execute the JOG operation in the test mode to check the rotation direction of the
servo motor and the ON/OFF of zeroing and zero point.
Note) Make the PLC CPU to the "STOP" status.
1) Double-click the project name to be checked
from the project tool bar.
2) Double-click the "Diagnosis" icon.
3) Double-click the "Checking connect" icon.
4) The dialog box appears asking whether to
close all the displayed windows. Click the
Yes button.
5) Connection check window appears. Click the
Online
button.
To next page