User`s manual

5 - 12 5 - 12
MELSEC-Q
5 SETUP AND PROCEDURES BEFORE OPERATION
5.5 Confirming the wiring
5.5.1 Confirmation items at completion of wiring
Check the following points when completed with the QD70 installation and wiring.
Is the module correctly wired? ..............................."Connection confirmation"
By making "connection conformation", you can check whether the "QD70 recognizes
the external I/O signals such as the near-point dog and speed-position switching
signals", for example.
The following is the way to make "connection confirmation".
(1) Method using GX Developer
Read the "
Md. 8
External I/O signal" axis monitor data with the monitor function
(Buffer memory batch) and check the read values.
Buffer memory address
Axis 1 Axis 2 Axis 3 Axis 4 Axis 5 Axis 6 Axis 7 Axis 8
Md. 8
External I/O signal
80 180 280 380 480 580 680 780
[Bit pattern]
b15 b0b4b8b12
0 : OFF
1 : ON
Not used
Storage item
Meaning
Zero signal
Near-point dog signal
Speed-position switching signal
Deviation counter clear signal
(Example) Checking the external I/O signals of Axis 1
<GX Developer display screen>
b0 (Zero signal ON)
b1 (Near-point dog signal ON)
b2 (Speed-position switching signal OFF)
b3 (Deviation counter clear signal OFF)
Set the buffer memory address of " Md. 8
External I/O signal" of Axis 1 in decimal.
The states of the external I/O signals can also be checked by system monitor.
For details, refer to "Section 12.3 External I/O signal monitor function".