8. Test run
Confirm that the group settings and interlock settings are complete before performing a test run.
8-1. Collective operation ON/OFF
Test run procedure
1. Turn on the power to the EB-50 and all units. LED857 on the EB-50 turns on.
2. When LED857 turns off, press the Collective ON/OFF switch (SW853). The group of units will start an operation.
When the group operation starts, LED858 turns on.
* The equipment connected to DIDO controller cannot be operated.
3. Check for proper operation of each unit during the test run.
4. Press the Collective ON/OFF switch (SW853) to stop the units.