User`s manual
Table Of Contents
- SAFETY PRECAUTIONS
- CONDITIONS OF USE FOR THE PRODUCT
- REVISIONS
- INTRODUCTION
- CONTENTS
- ABOUT MANUALS
- HOW TO USE THIS MANUAL
- ABOUT THE GENERIC TERMS AND ABBREVIATIONS
- PACKING LIST
- 1. OVERVIEW
- 2. SYSTEM CONFIGURATION
- 3. FUNCTION LIST
- 4. INSTALLATION AND UNINSTALLATION
- 5. SCREEN MAKEUP AND BASIC OPERATIONS
- 6. PROJECT CREATION
- 7. SYSTEM CHECKING FROM PERIPHERAL DEVICE
- 8. DATA SETTING
- 9. WRITING TO/READING OF/VERIFICATION OF POSITIONING MODULE DATA
- 10. POSITIONING DEBUGGING
- 11. USEFUL FUNCTIONS
- APPENDIX
- Appendix 1 Read from Module/Write to Module Reference Processing Times
- Appendix 2 Restrictions Depending on Function Version of QD75
- Appendix 3 Functions Added to/Changed from the Previous Versions
- Appendix 4 Uninstalling the License Key FD
- Appendix 5 Parameter Names Shown in GX Configurator-QP Screens and Manuals
- INDEX

1 - 7 1 - 7
MELSOFT
1. OVERVIEW
1.2 Manual Makeup
This manual is made up of 11 chapters and appendices.
This manual assumes that GX Configurator-QP is used to perform steps from
positioning control system checking to operation in the following procedure.
<Sequence of steps taken by the user up to positioning control system operation>
Step 1: Install and wire the positioning control system. Refer To
• Install and wire the programmable controller (such as the QCPU/LCPU, QD75/LD75/LD77, I/O
modules and intelligent function modules), servo amplifiers, motors, external switches and other
external devices.
User's manual for
the positioning
module used
Step 2: Check the GX Configurator-QP functions and learn the basic operations. Refer To
• Check the system with which GX Configurator-QP can be used. Chapter 2
• Check the functions that can be performed by GX Configurator-QP. Chapter 3
• Install GX Configurator-QP in the peripheral device and start the program. Chapter 4
• Learn the GX Configurator-QP screen makeup and basic operations. Chapter 5
Step 3: Start operation of GX Configurator-QP. Refer To
• Create a project which will be the object of operation for GX Configurator-QP. Chapter 6
Step 4: Check the connection and initial operation of the positioning control system. Refer To
• Specify the QD75/LD75/LD77 to be accessed, ports where cables will be connected, and others.
• Check the QD75/LD75/LD77 types and I/O addresses of the stations connected.
• Check connection according to the signal states from the external devices.
• Check the alarms and warnings of the positioning module.
• Check that the servo motors are run by JOG operation.
Chapter 7
(To the next page)