User`s manual

Table Of Contents
11 - 3 11 - 3
MELSOFT
11. USEFUL FUNCTIONS
11.1.2 Changing the model after data setting
PURPOS
E
Change the QD75 model after setting the parameters, positioning data or other
data.
If you choose "New Project read to module" in New Project, the model is the same
as the QD75 at the read destination. Therefore, when utilizing the data for the
other model, change the QD75 model after completion of read.
(Note that a model cannot be changed in LD75 and LD77 projects, and cannot be
changed to LD75 or LD77 in QD75 projects.)
BASIC OPERATIO
N
1. Set the required project as the active project. (Refer to Section 5.2.)
If in the monitor or test mode, choose the offline status.
2. Click the [Project]
[Change module type] menu.
3. To close the screen being displayed, click the "OK" button in the confirmation
dialog box.
4. Choose a new model in the Select module type dialog box.
5. Click the "OK" button.
DISPLAY/SETTING SCREE
N