Specifications

79 GX Configurator-DP
(c) 2006 MITSUBISHI ELECTRIC CORPORATION
The symbolic name for the transfer setup has changed and can be selected from the
Transfer
Setup Names
drop-down list.
Command Test
The configured transfer setup can be tested online. When the <Test> button is clicked, a
connection to the master module is initiated in two steps using the configured communication
interfaces and parameters
1. connect to the target PLC
2. connect to the master module within the target PLC with the specified slot
If no module of the type selected in the project is found in the specified slot, a list of the modules
found in the target PLC rack is displayed, so the user can determine the slot number of the master
module and correct it.
If you click on the <Test> button and the connection to the PLC can be established, a message is
displayed.
The type may differ from the CPU type, which the user has set in the selected transfer setup. As
long as the connected CPU belongs to the selected 'PLC Series', the exact CPU type is
automatically detected.
Failing of a PLC CPU connection leads to a warning message.
In that case check the transfer setup settings and the cable connection between PC and PLC.