Specifications

178 GX Configurator-PN
(c) 2013 MITSUBISHI ELECTRIC CORPORATION
If the configuration contains only one or more QnU-projects
If the project contains an additional motion CPU
If the project contains an additional NC CPU
Name
Description
Choices /
Range
Default
Update QnU-CPUs
updates the parameter on QnU-CPUs and,
if assigned, in the respective GD/GID/
GXW2 project.
If the CPU is the controlling CPU of the
PN controller and a GXW2 project has be-
en assigned, the user library for
PROFINET is added to that project. If a
GID project has been assigned, the user
library is copied to a sub folder in the GID
project directory and must be manually in-
stalled by the user.
selected /
not selected
selec-
ted
Update PN Control-
updates the parameters on the PN control-
selected / not
selec-