Specifications

137User Interface
(c) 2013 MITSUBISHI ELECTRIC CORPORATION
Name
Description
Choices /
Range
Default
Watchdog Fac-
tor
This value is used to calculate the production
and consumption time out period.
Time out period = Refresh period * Watchdog
factor
The result is displayed in the Watchdog field.
-
3
Watchdog
Production and consumption timeout period
read-only
-
Description
Provides help on the selected field.
read-only
-
Previous
Get settings of previous I/O device (slave)
disabled for
first device
-
Next
Get settings of next I/O device (slave)
disabled for
last device
-
OK
Close dialog and save changes
-
Default
button
Cancel
Close dialog and discard changes
-
-
Help
Open online help
-
-