Specifications
1
OVERVIEW
2
CONNECTION TO α2
2.3 Preparatory Procedures for Monitoring
2.3.7 Checking for normal monitoring
2 - 13
4 Confirming the PLC side setting
When connecting the GOT, setting is required for the
PLC side.
Confirm if the PLC side setting is correct.
Section 2.4 PLC Side Setting
All settings related to communications are complete now.
Create screens on GT Designer2 and download the
project data again.










