Specifications
2 - 6
2.3 Preparatory Procedures for Monitoring
2.3.1 Installing OS onto GOT
2.3 Preparatory Procedures for Monitoring
The following the procedures to be taken before monitoring
and corresponding reference sections.
Confirming the α2 side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the
following.
Section 2.4 PLC Side Setting
2.3.1 Installing OS onto GOT
Install the standard monitor OS, communication driver and
option OS onto the GOT.
For the OS installation methods, refer to the following
manual.
GT Designer2 Version Basic Operation/Data
Transfer Manual
1 Check-mark a desired standard monitor OS,
communication driver, option OS, and extended
function OS, and click the button.
Installing communication driver onto GT10
When installing communication driver onto the GOT,
turn on the GOT in the OS transfer mode.
GT10 User's Manual
(Operating of transmission mode)
Install the OS onto the GOT.
Section 2.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 2.3.2
Checking OS installation on GOT
Set the communication interface.
(Communication settings)
Section 2.3.3
Setting communication interface (Communication settings)
Download the project data.
Section 2.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 2.3.5
Attaching communication unit and connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 2.3.6
Verifying GOT recognizes controllers
Make sure that monitoring is performed normally.
Section 2.3.7
Checking for normal monitoring
Check the following under the Communication driver.
ALPHA2
Install
Turn on the GOT while the bottom right corner is touched.










