Operation Manual

−33−−32−
How to do the [Operation to fill up]
Until the hot water amount becomes 100%, the heat pump units are operated.
1.
Start operation
When pushing
Operation to fill up switch,
the [Acknowledge for operation to fill up] screen is
displayed.
If it is pausing by pushing
Run/Pause switch, the [Operation to fill
up] cannot be started.
After starting operation by pushing
Run/Pause switch, push
Operation to fill up switch.
2.
When tapping Start button, the [Operation to fill up]
starts and the TOP screen is displayed.
3.
End operation
The heat pump unit keeps operation, until the [Operation
to fill up] becomes end.
However the [Operation to fill up] can be interrupted with following. procedure.
Push Operation to fill up switch and tap Finish buttonon
the [Operation to fill up acknowledge] screen. (
Go to 4)
②
Make the operation in Pause by pushing Run/Pause switch.
Even if the setting becomes [Pause] during [Operation to fill up] due
to [Setting of day off], the [Operation to fill up] is kept on.
4.
When tapping Finish button on the [Acknowledge]
screen, the [Operation to fill up] finishes and it returns to
the TOP screen.
1
2