Specifications

St. David Catholic School Manning Architects
Gym and Classroom Replacement N10.024.00
New Orleans, Louisiana July 20, 2012
INTRUSION DETECTION SYSTEM 16650 -7
3. All wiring shall be installed in minimum ½” conduit, cable, installed parallel and square
with building lines. Conduit fill shall not exceed forty percent (40%). All wires shall be
gathered and tied up to create an orderly installation.
3.03 TESTING AND CERTIFICATION
A. The Contractor shall demonstrate the functionality of the System upon completion of
installation, documenting the result of all tests and providing these results to the Owner.
The System shall be tested in accordance with the following:
1. The Contractor shall conduct a complete inspection and test of all installed
equipment. This includes testing and verifying connection to equipment of other
Divisions.
2. The Contractor shall provide staff to test all devices and all operational features of
the System for witness by the Owner’s representative and the Authority having
jurisdiction. The Contractor shall provide two-way radio communications to assist in
the testing. All testing must be witnessed by the owner’s representative, prior to
acceptance.
3. The testing and certification shall take place as follows:
a. System shall be tested in conjunction with the manufacturer’s representative.
b. All deficiencies noted in the above test shall be corrected.
c. Test results shall be submitted to the consultant or owner’s representative.
d. System test witnessed by owner’s representative and correction of any
deficiencies noted.
e. The owner’s representative shall accept the System.
f. System test shall be witnessed by the Authority having Jurisdiction, and any
deficiencies that are noted shall be corrected.
4. A letter of certification shall be provided to indicate that the tests have been
performed and all devices are operational.
END OF SECTION 16650