Instruction manual

INSTALLATION
5
(5) Secure the option unit to the inverter with two mounting screws. If the
screw holes in the option unit do not line up with the inverter mounting
holes, check that the connectors have been fitted correctly.
(6) To ensure proper Network Grounding, connect a harness (NOT
Supplied) from FR-A5NM Ground terminal to inverter Ground terminal.
For ease of routing, the harness should be passed between the Top
and Bottom board. (Refer to the following diagram.)
Recommended crimping terminal : 1.25-3
Recommended Ground harness size : 16AWG
Torque to 0.4 - 0.7Nm
Figure 3 : Earth (Ground) harness connection
Node address DIP switch
M3 screw
DB9 connector
M3 nut
Crimping
terminal
Earth (Ground)
harness
To GND terminal
of the inverter