User`s manual

1-7
1.3 Part Names and Functions
INP-TN5A0202-E
Loader communication port
Connecting the equipment to the PC that is installed PUM parameter loader software with a loader connecting cable (optional).
Station No. con guration switch
Set 0 to 7 according to the PLC connection method (1:1 connection or 1:N connection).
Note
When performs programless communication with 1:1 connection, make sure to set "0" to the station number of this
equipment. Otherwise, this equipment can not perform communication with PLC.
When performs programless communication with 1:N connection, make sure to set station numbers of this equipment in
order, from "0". If there are missing numbers with the station numbers, this equipment can not perform communication
normally with PLC.