Installation manual

[ V Electrical Wiring Diagram ]
- 100 -
HWE10050 GB
(8) CMB-P108V-GB1 model
Symbol explanation
Fuse AC250V 6.3A F
F01
TerminalT1~8
TB02
TB01
REL.B
CONT.B
Circuit
board
Relay
BC controller
Terminal block
(for Transmission)
Solenoid valve
Terminal block
(for power source)
Expansion valve
Thermistor sensor
Transformer
NameSymbol
SV1~8A,B,C
TR
TH12,15
LEV3
Note:
1. TB02 is transmission
terminal
block.
Never connect power
line to it.
2. The initial set values
of switch on CONT.B
are as follows.
SW1:0
SW2:0
SW2 SW1
110
(Red)
(Yellow)
DSA
F01
250VAC
6.3A F
81
OFF
ON
SW4
SW5
OFF
ON
81
T6
T2
T3
T4
T5
T1
T7T8
Indoor/outdoor
Transmission line
PE
TO NEXT INDOOR UNIT
PULL BOX
FUSE(16A) BREAKER(16A)
POWER SUPPLY
~220V-240V
50Hz/60Hz
PE
REL.B
CNTR
1
3
CN26
CN38
31
531
7654321
CN50
TR
TH15
TH12
CN11
CN10
CN02CN03
12321
1
2
3
4
8
7
6
5
4
3
2
1
1
2
LEV3
123456
CONT.B
CN52
1
3
CN39
1234567
220V~240V20V~22V
SV6B
SV6A
SV6C
1
2
3
4
1
2
3
4
33
2
1
2
1
16
15
14
7
6
5
13
12
11
10
9
8
16
15
14
7
6
5
10
9
8
13
12
11
4
4
4
4
3
3
3
3
2
2
2
2
1
1
1
1
SV5C
SV5A
SV5B
SV4B
SV4A
SV4C
SV3B
SV3A
SV3C
SV2B
SV2A
SV2C
2
3
4
1
2
3
4
2
3
4
2
3
4
1
1
1
7
5
3
1
7
5
3
1
7
5
3
1
7
5
3
1
7
5
3
1
7
X4
X3
X31
X6
X5
X32
X8
X7
X33
X10
X9
X34
X12
X11
X35
1
4
2
3
1
4
2
3
4
3
2
1
SV1C
SV1A
SV1B
1
2
3
4
5
3
1
X2
X1
X30
12341234
12341234
SV7B
SV8B
SV7A
SV8A
SV7C
SV8C
131415 101112 9 78654
487 6512 11 10 915 14 1316
16
CN32
X14
X13
X36
X37
X15
X16
X18
X17
X38
X39
X19
X20
57317531753175133 3
CN12
TB02
S(SHIELD)
M2
M1
(Red)
CN13
CN07
ZNR01 ZNR02
N
L
TB01
CN27(Red)
CN28(Blue)
CN29(Green)
CN30(Black)
CN35(Blue)
CN34(Black)
CN33(Red)
CN31(Yellow)