Installation manual
[ VIII Test Run Mode ]
- 192 -
HWE10040 GB
(2) Heating operation
Operation
Outdoor unit model
PUHY-EP650YSJM-A
PUHY-
EP200YJM-A
PUHY-
EP200YJM-A
PUHY-
EP250YJM-A
Operating
conditions
Ambient
tempera-
ture
Indoor
DB/WB
20°C/- [68°F/- ]
Outdoor
7°C/ 6°C
[45°F/ 43°F]
Indoor
unit
No. of connected
units
Unit
7
No. of units in opera-
tion
7
Model - 100/100/100/100/100/100/50
Piping
Main pipe
m [ ft ]
5 [17]
Branch pipe 10 [33]
Total pipe length 75 [247]
Fan speed - Hi
Amount of refrigerant
kg
[ lbs-oz ]
33.0 [73]
Outdoor
unit
Electric current A 29.7
Voltage V 400
Compressor frequency Hz 53 53 71
LEV open-
ing
Indoor unit
Pulse
332/332/332/332/332/332/373
SC (LEV1) 0
LEV2 2100 2100 2100
Pressure
High pressure (after O/S)/low
pressure (before accumulator)
MPa
[ psi ]
2.81/ 0.68 2.81/ 0.68 2.85/ 0.62
[408/ 99] [408/ 99] [413/ 90]
Temp. of
each sec-
tion
Outdoor
unit
Discharge (TH4)
°C [ °F ]
82 [180] 82 [180] 82 [180]
Heat exchanger inlet
(TH3)
2 [36] 2 [36] 2 [36]
Accumulator inlet 0 [32] 0 [32] 0 [32]
Accumulator outlet 0 [32] 0 [32] 0 [32]
Compressor inlet 0 [32] 0 [32] 0 [32]
Compressor shell
bottom
42 [108] 42 [108] 42 [108]
Indoor
unit
LEV inlet 35 [95]
Heat exchanger
inlet
80 [176]