Specifications
CNTR-28
CONTROLLER (Feb. 2009)
CONTROLLER
DATA U4
3. System remote controller
DATA U3
CONTROLLER Cntr- 28
NOTE
Perform the LAN wiring before installation, and wire up to the body by the same method as wiring the M-
NET transmission line.
When a LAN is already connected, decide the IP address by consultation with the system administrator and
connect to the LAN body after changing the IP address.
Space for the connector and wiring is required.
Refer to Installation Manual.
Connect the LAN cable to the LAN connector of this device.
Procure the LAN cab
The maximum wiring length from HUB to GB-50A is 100m [328ft].
GB-50A is connected to the monitoring PC via HUB.
le at the site, and use an enhanced category 5 UTP cable.
For a description of the IP address setting method, refer to Installation Manual.
LAN is 10 BASE-T Specification.
3-5-3. LAN connection function
3. SYSTEM CONTROLLER










