Specifications
98AEtypMMSspec_RevB.doc
7
Copyright © 2007, Mitsubishi Electric Power Products Inc.
SP-0011 Rev. B 9/5/09
7. There should be no inflammable / explosive gas.
8. Dust in the room where the UPS is installed must not exceed normal atmospheric
dust levels. In particular, that dust should not include iron particles, oils or fats, or
organic materials such as silicone.
B. Audible acoustical noise: Noise generate by the UPS, when operating single module
under full rated load, at a distance of one meter from any UPS operator surface, shall not
exceed ___dB as measured on the A scale of a standard sound level meter at slow
response.
C. Input surge withstand capability: The UPS shall be in compliance with IEEE C62.41,
Category B.
1.7. WARRANTY
The UPS manufacture shall warrant to the original end user that the Uninterruptible
Power Supply System sold by Mitsubishi Electric Power Products, Inc. (the “Product”)
shall be free from defects in material and workmanship under normal use and service for
a period of twenty four (24) months from the date of installation or thirty months (30)
months from the date of shipment of the Product, whichever comes first, at the premises
of the original end user.
1.8. QUALITY ASSURANCE
1.8.1. Reliability and Maintainability
The UPS equipment reliability shall be represented in terms of theoretical Mean
–Time – Between - Failures (MTBF). The UPS manufacturer shall, as a minimum,
provide the following capability:
A. UPS module output includes reliability of bypass circuit: 1,000,000 MTBF
hours.
B. UPS module operation output, without bypass circuit: 120,000 MTBF hours.
1.8.2. Maintainability
MTTR of the UPS shall not exceed 1 hour including time to replace components.
1.8.3. Factory Test
A. The manufacturer shall fully and completely test the UPS module to assure
compliance with the specifications, before shipment.
B. All UPS units shall come equipped with one (1) factory test report included in
the UPS enclosure. The factory test report shall include the following:
1. Series / kVA
2. Serial Number
3. Date of test
4. Approved by / Inspected by / Tested by
5. Inspection of construction
6. Checking of wiring (Black/Red marking on each connection point)