This transition shall be accomplished without any switching or coupling, and with no
interruption of power to the critical load from either a failure or restoration of the utility
AC power.
C. Recharge - Subsequent to restoration of utility AC power, the rectifier shall automatically
reactivate and provide DC power to the inverter, simultaneously recharging the system
battery. This occurs automatically and without interruption to the critical load.
D. Bypass - In the event that the UPS must be taken off line due to an overload condition or
UPS failure, the critical load shall be transferred to the bypass source via the static
switch without interruption of AC power to the critical load. A paralleling, wrap-around
contactor shall be used to maintain the bypass source. The static switch shall only be
utilized for automatic emergency transfers. A re-transfer from bypass to inverter shall
be performed automatically in overload conditions. A re-transfer shall be inhibited if
satisfactory synchronization of the inverter and bypass is not accomplished. The use
of the static switch shall not be required during the manual or automatic re-transfer
process, therefore increasing reliability.
E. Maintenance Bypass The UPS system shall be equipped with an external MBS to
allow safe and reliable maintenance of the UPS. The MBS shall be of the
Make-Before-Break, “Zero Energy” type to ensure maximum load reliability and
personnel safety.
1.4 SUBMITTALS
1.4.1 Proposal Submittals
Submittals with the proposal shall include;
A. System configuration with single-line drawings.
B. Functional relationship of equipment including weights, dimensions, and heat
dissipation.
C. Descriptions of equipment to be furnished, including deviations from these
specifications.
D. Size and weight of shipping units to be handled by installing contractors.
E. Detailed layout of customer power and control connections.
F. Detailed installation drawings including all terminal locations
1.4.2 Delivery Submittals
Submittals upon UPS delivery shall include;
A. Shop Drawings.
Submit system configurations with single line diagrams, detailed layout of power and
control connections, dimensional data and detailed installation drawings including all
terminal locations.
B. Product Data.
Provide product data for UPS and battery including catalog sheets and technical data
sheets to indicate electrical performance, UPS type, battery type, detailed equipment
outlines, weight, dimensions, control and external wiring requirements, heat rejection
and air flow requirements.
C. Owners and technical manual (1).
D. Test Report